Job Duration   20 weeks

Challenges Overcome   Successful recladding with minimum disruption to library services and the surrounding community​

Project Value  $ 470,000



ProjectImage

Merryland’s Library entrance


Outcome


  • Successfully replaced deteriorating cladding with James Hardie Exo Tec System to improve building aesthetics and structural integrity.​
  • Coordinated with Council for timely meetings, site walkthroughs, and hold point inspections to ensure project progress and compliance.​
  • Implemented pedestrian and traffic management plans to ensure public safety and accessibility throughout the construction period.​
  • Completion of project within the stipulated 5-month timeframe, allowing the library to remain operational throughout the recladding process.​
  • Maintained courteous and respectful conduct of all workers, considering the high-profile nature of the site and its frequent visitors.​

Systems


  • Developed and adhered to a prestart checklist to ensure all necessary documentation and safety measures were in place before commencing work.​
  • Established hold points at key stages of the project, including cladding removal, wall preparation, window installation, and final inspection.
  • Implemented a comprehensive waste management plan to dispose of generated rubbish off-site responsibly.
  • Installed appropriate WHS signage and traffic control measures, including temporary fencing, to mitigate hazards and ensure public safety.​
  • Provided detailed methodology for keeping water out of the building during rain periods when cladding was temporarily removed.​


ProjectImage

Merryland’s Library and adjacent Cumberland Council admin


Safety


  • Conducted dilapidation reports to assess and mitigate risks to adjacent structures and surrounding areas.​
  • Fenced off work areas and provided clear access routes for pedestrians and emergency services to ensure public safety.​
  • Implemented comprehensive traffic control measures, including WHS signage and certified traffic controllers, to mitigate hazards related to vehicular traffic.​
  • Developed a methodology for managing construction hazards such as falling objects, electrical safety, and structural stability.​
  • Proactively addressed potential risks such as lead paint removal, ensuring adherence to safety protocols and regulations.​

Sustainability


  • Implemented noise reduction measures and dust control techniques to minimise disruption to nearby residents and maintain air quality.​
  • Coordinated with Council officers to ensure compliance with environmental regulations and standards, including waste management and recycling initiatives.​
  • Selected environmentally friendly construction methods and materials to minimize the project's carbon footprint.​
  • Minimized waste generation through responsible disposal practices and recycling efforts.​
  • Demonstrated commitment to sustainability by prioritising energy-efficient building practices and reducing environmental impacts throughout the project lifecycle.